Sign In | Join Free | My ecer.co.uk
China Shanghai Yekun Construction Machinery Co., Ltd. logo
Shanghai Yekun Construction Machinery Co., Ltd.
Shanghai Yekun Construction Machinery Co., Ltd.
Verified Supplier

6 Years

Home > Excavator Mounted Pile Driver >

High Storage Building Excavator Vibro Hammer For Sheet Pile Driving Projects

Shanghai Yekun Construction Machinery Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

High Storage Building Excavator Vibro Hammer For Sheet Pile Driving Projects

  • 1
  • 2
  • 3

Brand Name : VIBRA

Model Number : FV-280

Certification : ISO 9001:2015

Place of Origin : Shanghai, China

MOQ : 1 set

Price : Negotiation

Payment Terms : L/C, T/T, D/P, D/A, D/P, Western Union, MoneyGram

Supply Ability : 15 Set/Month

Delivery Time : 7-35 days

Packaging Details : 5 CBM

Name : Excavator Mounted Pile Driver::Piling and Pulling

Feature : Capable of driving long piles in hard soil condition

Arm Weight : 500kg

Operation Pressure : 32Mpa

Hammer Weight : 1900kg

Vibration Frequency : 2800rpm

Centrifugal Force : 335KN

Excavator : 20-30T

Material : Steel, Core materials are all imported

Color : Blue/Yellow/Red/White, customized color available

Type : Hydraulic Vibrating Hammer

HS Code : 8430100000 as pile driver accessories

Contact Now

Vibro hammer for sheet pile driving projects of high storage building

VIBRA pile driver was installed on Doosan excavator with the aim of fulling customer requirements of driving sheet piles in high storage building construction projects. Customers first use it to drive till 12 meter sheet piles to see how it performs, while the STP value was relatively low, helps the sheet pile to drive into the ground quite easily. The construction site has some where STP value was relatively high, later VIBRA pile driver able to drive those places as perfectly as performed in other areas. VIBRA pile driver with efficient, flexible use, set up a faster working environment at the construction site, not only greatly reduce the cost of the project, but also produce aggregate profit!

Technical Parameter

Item FV-250 FV-280 FV-300 FV-330 FV-350L FV-350 FV-400
Vibration Frequency (rpm) 2500 2800 3200 3200 3200 3200 3200
Operation Pressure (Mpa) 30 32 32 32 32 32 32
Centrifugal Force (KN) 265 335 350 372 435 455 485
Max.Pile Length (m) 10 12 12 12 15 15 18
Arm Weight (kg) 500 500 670 670 670 750 750
Hammer Weight (kg) 1700 1900 2100 2300 2400 2600 2700
Excavator (T) 20-30 20-30 30-35 33-40 35-40 40-45 45-60

Working Principle

Hydraulic vibrating pile driver take the advantage of high frequency vibration generated by motor and transit the vibration force to the hydraulic vibrating pile driver for the surrounding soil liquefying & break its structure to reduce the friction; then piling or drilling the pile form the soil ground via excavator. The high frequency vibration is driven by the hydraulic motor of the excavator.

The hydraulic motor drives the two eccentric axes to rotate at high speed in opposite direction. The horizontal force of the eccentric axis cancels each other without vibration. The vertical forces add up to each other, creating a vertical-frequency vibration.

Machinery Characteristics

  • The control system adopts integrated import control valve, each action can be controlled independently, convenient for maintenance and check.
  • The vibration frequency is controlled at two stages, and the second stage vibration is the confluence of double pumps, which greatly increases the excitation force and overcomes the special geology.
  • Mini and light weight design make application flexible.
  • Taking the advantage of the excavator hydraulic system without other driving system requirement, which save fuel oil and transportation cost.
  • The operation is simple and easy to learn. The driver who has the operation foundation of excavator can operate it with practice

FAQ

Q: How long is the warranty period ?

A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.

Q: What is the MOQ ?

A: One set is available.

Q: What's the payment method ?

A: We accept L/C, T/T and D/P payment.

Q: What is the delivery time ?

A: The delivery time is generally 1-8 days, and arrive at Shanghai Port. Shipping time should be considered overseas.

Q: Can I have our LOGO on the machine ?

A: Of course you can.

Q: How is your product quality ?

A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".

Q: Can I be your dealer ?

A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!


Product Tags:

High Storage Building Excavator Vibro Hammer

      

Sheet Pile Driving Excavator Vibro Hammer

      

Steel Excavator Mounted Pile Driver

      
Quality High Storage Building Excavator Vibro Hammer For Sheet Pile Driving Projects for sale

High Storage Building Excavator Vibro Hammer For Sheet Pile Driving Projects Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shanghai Yekun Construction Machinery Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)